CN    /   EN    /    SEARCH 

All categories >
Ba River Bridge
Extradosed bridge for railway using galvanized pc strand.

Span (108+2x200+108)m.
Details 白箭頭 黑箭頭
Hefei Zhouyu Main Road Bridge
Stayed cable bridge using 1860MPa galvanized PC strands.

Span (150+60+36)m.
Details 白箭頭 黑箭頭
Shuanghe Bridge
Combined beam of high and low towers, double towers and double cable plane cable-stayed bridge

Main span 356 m.
Details 白箭頭 黑箭頭
Hongxi Bridge
Double tower double cable plane prestressed concrete box girder, double low pylon extradosed bridge.

Main span 265 m.
Details 白箭頭 黑箭頭
Dong Jiang Bridge
The world widest 4 lines railway extradorsed bridge, with the world biggest 109 holes
cable anchorage in railway project.

Span (136+265+136)m
Details 白箭頭 黑箭頭
A Peng River Bridge
China highest pier stayed cable bridge, double tower and double cable plane stayed cable bridge.

Span (135+240+135) m
Details 白箭頭 黑箭頭
External prestressed anchor
Details 白箭頭 黑箭頭
External prestressed bundle
Details 白箭頭 黑箭頭
Pre
1
2
4
logo

Hello, please contact us if you have any questions, please feel free to submit any questions and suggestions about us, we will reply you as soon as possible.Thank you for your help. We are at your service 24/7!

      

這(zhè)是(shì)描述信息

Mail box:zhemao123@163.com

這(zhè)是(shì)描述信息

Address: High-tech Industrial Function Zone, Fuyang City, Zhejiang Province (No. 128 Golf Road)

Copyright ©2019  Zhejiang Anchor Technology Co., Ltd. All rights reserved  京ICP證000000号   Powered by www.300.cn